Geographically our experience is equally impressive. Recent projects have ranged from the UK to the UAE, Russia, Latvia, Hungary, Zambia and Zimbabwe, to mention just a few.
It is rare to find any consultancy team so totally familiar with all the diverse engineering skills required in planning and constructing specialised plant. It is this multi-disciplined team expertise that ensures not only that all the engineering functions work effectively together, but that client requirements are always efficiently translated into a finished project that operates effectively.
The following lists some examples of FJB Systems' projects throughout the years. The list is far from exhaustive but aims to show the diversity of our work. For those who have a greater interest in any of these projects, a short document, which can be viewed in either PDF (Acrobat) format with full photographs or in plain text (without), has been provided below for a selection of the projects. These documents outline in more detail the scope of work involved in each project, the project details as well as other technical and cost issues.
Recently Completed Major Projects
| Location | Completion Date | Project Type |
Approx. |
|
Newmarket, UK Download |
May 2005 | Full design and project management of a ready meal factory taking in frozen poultry to convert into poultry based meals. Complete with thawing rooms, manufacturing facility, refrigerated storage, amenities and offices |
UK£2.0m
|
| Ludlow, UK | September 2005 |
Survey of an existing abattoir business to recommend improvements required in order to satisfy the long term EU licensing requirements. Preparation of drawings and specifications, full tendering and project management of a new chiller block and EU licensed cutting room . |
UK£0.25m
|
| Oxford, UK | August 2005 |
Preparation of a business plan to assess the viability of expanding an existing abattoir business to incorporate larger chillers and a new boning room (EBLEX funded study). The study was then followed by the preparation of full detailed specifications and drawings which were then put out to tender. FJB Systems then project managed the whole project through to completion. |
UK£0.7m
|
|
Chessington, UK Download |
July 2005 | Full design and project management of a specialist fish processing facility where imported fish is filleted and then retail packed into ready meals. |
UK£2.5m
|
| Doha, Qatar | January 2004 |
Preparation of a business plan and market study to analyse the viability of setting up an imported sheep feedlot and abattoir. Preparation of drawings for a new two species abattoir (2,500 sheep/shift and 50 cattle/camels/shift and a 40,000 head sheep feedlot. Preparation of tender drawings and specifications for a new vegetable storage facility and market. Preperation of drawings for a new livestock auction facility - sheep, camel, beef and birds of prey. |
UK£250m
|
| Isle of Grain, UK | March 2003 | Preparation of drawings & specifications for building works, refrigeration works, electrical works and insulation panel works for upgrading an existing port-side warehouse into an imported food quarantine and inspection facility. |
UK£1.4m
|
| Heathrow, UK | August 2003 | Investigation into cold store roof void condensation. Work involved undertaking a full thermal image of the facility, determination of the cause of condensation, recommendations for rectification. This was then followed by the tendering out of the panel replacement works. All works carried out within -25degC conditions to allow the store to remain operational. |
UK£0.35m
|
| Raska, Yugoslavia | February 2002 | DTI funded assessment and costing of beef slaughter facility in Kosovo, with a view to upgrading to meet EC requirements and re-opening. |
N/A
|
| Khartoum, Sudan | November 2002 | Preparation of detailed Computerised Interactive Business Plan and marketing report for the construction of a new large scale dual species abattoir and packing plant in the Sudan |
N/A
|
|
Newmarket, UK Download |
1994, 1996, 1998, 2001 & 2005 | Design and project management of vehicle servicing depot , ambient warehousing, chill & cold storage facilities, blast freezing and pick & distribution facilities. |
UK£24.0m
|
| South
Dakota , USA
Download |
November 2001 | Preparation of full Computerised Interactive Business Planning Model for dual species slaughter, rendering & boning facility along with report & recommendations. |
N/A
|
| Worksop, UK | December 2000 | Design of insulation panel, refrigeration, mechanical & electrical services for large pre-packed sandwich manufacturing facility |
UK£21.0m
|
|
Zilina, Slovak Republic |
July 1999 | Upgrade of existing poultry plant to meet EC Standards & design of cooked poultry meat further processing plant |
US$3.5m
|
| UK | January 1999 | Review and assessment of a complete nightclub franchise for a leading plc to assess the inadequately installed air conditioning plants and recommendations to improve these at minimum cost |
N/A
|
| Haworth, UK | February 1999 | Due diligence investigation into two poultry slaughter, boning and further processing plants. Assessment of structures and services, throughput capabilities and expansion possibilities of each site and estimation of likely capital and maintenance cost requirements for the next ten years. |
N/A
|
| Stowmarket, UK | March 1999 | Feasibility study and cost estimates for the upgrade of an existing pork abattoir and the phased construction of a new boning and full retail packing facility. |
N/A
|
| Port Stanley, Falkland Islands | June 1999 | Assistance to a large contractor in the preparation of tender documents for the building of a new slaughter facility on the Falkland Islands |
UK£2.5m
|
| Abu Dhabi, UAE | December 1998 | Port cold store facility |
US$15.0m
|
| Stowmarket, UK | July 1998 | Design of sandwich filling preparation and packaging factory |
UK£4.0m
|
| Stowmarket, UK | January 1996 | Economical upgrade of small scale tri-species abattoir to EC standards |
UK£0.25m
|
| Preston (UK) | July 1996 | Abattoir & cutting plant upgrade |
UK£1.2m
|
| Haverhill,
UK
Download |
October 1993 | Design and project management of state of the art pork abattoir with a 450/hour throughput. |
UK£7.5m |
| Zambia | January 1991 | Preparation of initial business plan into a proposed new beef slaughter and boning plant and report outlining recommendations. |
N/A
|
| Zlatoust, Russia | December 1990 | Assessment of Russian slaughterhouses and reports on viability in upgrading to EC standards. |
N/A
|
Note: To read PDF files you will need a copy of the (free) Acrobat Reader. Click on the logo below to go to Adobe's website to download the reader.